Claire Raftery / Tuesday, January 14, 2014 / Categories: UC Berkeley, Reviews ICON Passes System Requirements Review The ICON mission has passed its System Requirements Review, where the flowdown of top level requirements is traced through all aspects of mission implementation. We’ve gotten very good input from our Standing Review Board, whose key concerns become top priorities for the team to close out. Every NASA mission goes through this step on their way to the first design reviews, and we’re able to proceed with confidence that the team has a complete and verifiable set of requirements in hand. ICON has had a great systems engineering effort from the start and the mission, spacecraft and payload teams have been working together for years to get ready for this. Thanks to everyone who worked so hard on this review! Previous Article ICON Science Team Kicks Off Next Article ICON Passes Preliminary Design Review Print 4878